Back to Portfolio List

Clarius Park Inland Port Greer – B1

Greer, SC - (Greenville submarket)
  • 3-Building Master Planned Campus – 1,537,130 SF total capacity
  • B1 (550 Mason Farm Lane) – Complete, Fully Leased, Sold
  • B2 (560 Mason Farm Lane) – Under Construction 2022
  • B3 (549 Mason Farm Lane) – Under Construction 2022, Fully Leased
  • Less than 2 miles from Inland Port Greer

KEY STATS (BUILDING 1):

CLICK HERE FOR VIDEO

  • 551,670 SF (expandable to 1.1M SF)
  • 36′ Clear Height
  • 600′ Deep Crossdock w/ 200′ Truck Courts
  • 50’x 54′ Bays w/ 75′ Speed Aisles
  • 74 Loading Docks (+22 Future)
  • 4 Drive-In Doors
  • 144 Trailers Stalls
  • 216 Car Stalls (+148 Future)
  • Shell Building Completed Q2 2020
    • Spec Suite Under Construction Q4 2020
  • General Contractor: Evans General Contractors
  • Architect: McMillan Pazdan Smith
  • Leased By: CBRE
For more information, please contact: